James Dowzard
Systems Engineer
Systems engineer with nine years at John Holland on rail infrastructure projects, covering requirements, interfaces, hazard analysis, RAM and safety assurance from design through to handover. Currently Systemwide Strategies Manager on Sydney Metro West Linewide. I also write the software my teams use: data pipelines, project dashboards, API clients for the project systems, and AI agents built on them.
Capabilities
Systems engineering and assurance
- Technical interface management across multi-party rail projects
- Requirements management and traceability (Relatics, IBM DOORS)
- Safety cases and assurance arguments (EN 50126, GSN, SFAIRP)
- Hazard logs, safety risk assessment, FMEA and FRACAS
- RAM modelling and apportionment
- Configuration and change control, departures and design assurance
Software, data and AI
- Python, SQL, TypeScript, Svelte, Flask and FastAPI
- Databricks: dbt pipelines, Unity Catalog, Apps and Lakebase
- API clients and MCP servers for document control and engineering systems
- AI agents and LLM tooling for document review, drafting and data entry
- Power BI and Power Platform
- Machine learning for requirements classification
Experience
Systemwide Strategies Manager
Sydney Metro West Linewide · John Holland
Linewide is the John Holland package for the systems that run the length of Sydney Metro West, from Westmead to Hunter Street: track, 25 kV traction power, tunnel ventilation, earthing and bonding, signalling and communications infrastructure, and SCADA.
- Accountable for the Linewide plans and working groups for the systemwide disciplines: security, fire and life safety, noise and vibration, transit space, EMC, earthing and bonding, track, wheel-rail interface, pantograph and overhead line, and survey.
- Run the systemwide working groups with Sydney Metro, the station contractors and the trains, systems, operations and maintenance contractor.
- Review design packages against the systemwide requirements, and track interface issues through to close-out.
Systems Engineer, and Acting Stations & Third Party Interface Manager
Sydney Metro West Linewide · John Holland
- Managed technical interfaces with Sydney Metro, the station contractors and the trains, systems, operations and maintenance contractor.
- Coordinated the weekly interface action reconciliation with the operations contractor across eight disciplines, including signalling, communications, rolling stock, depots and platform screen doors.
- Ran the critical information exchange and design exchange cycle on design deliverables, with party-to-party traceability.
- Prepared Revision A of the Construction Interface Management Plan.
- Built the project's data platform and dashboards (see Software below).
Systems Assurance Engineer, then Senior Systems & Assurance Engineer
Rail Engineering & Innovation, and AI & Automation team · John Holland
Systems engineering and digital engineering support to rail projects across the business, including Sydney Metro Northwest, Canberra Light Rail, Gold Coast Light Rail Stage 3, Melbourne Airport Rail, Sydney Gateway, M7–M12 and the M5 West tunnel upgrade.
- Safety assurance and systems engineer on Gold Coast Light Rail Stage 3 (2021–2023): requirements allocation and verification matrices, the project safety hazard log, detailed hazard analysis workshops and the GSN safety argument.
- Set up and co-authored the first safety assurance statement for the Gold Coast Light Rail Stage 3 depot works.
- Co-led concept-stage hazard reviews for Canberra Light Rail with the builder and operator (December 2022 and February 2023), and took part in risk and opportunity reviews on the Canberra Light Rail Depot Modification project.
- Co-wrote the automation capability and resourcing options paper (June 2023) that set out how the business would resource systems engineering automation.
- Led Safety in Design workshops on the M5 West tunnel upgrade and M7–M12, covering hazard identification, control selection and the preliminary hazard log.
- Co-authored the operational safety case addendum and safety and systems assurance plan addendum for Canberra Light Rail operations.
- Led an initiative to classify tender requirements with machine learning, from the business case (2022) to working prototypes.
- Developed a GIS hazard workflow for Melbourne Airport Rail that updated IBM DOORS Next automatically.
System Safety Engineer
Cross Yarra Partnership, Metro Tunnel, Melbourne · John Holland
- Wrote the system hazard analysis report.
- Built the safety control verification matrix used to confirm controls were in place before dynamic testing.
- Reviewed design changes and RAM FMECAs for safety impact and brought the results into the hazard log.
- Automated the hazard log reporting and built a dashboard of control progress.
Systems Assurance Engineer
Canberra Light Rail, Sandford Street stop · John Holland
- Wrote the systems assurance approach for adding a stop to the operating network, scaled to the risk of a change to an existing system under EN 50126.
- Agreed the assurance scope with the operator, the construction contractor and the client, and produced the handover safety assurance report addendum.
- Wrote the GSN safety argument for the system change.
Systems Assurance Engineer
New Intercity Fleet Maintenance Facility, Kangy Angy · John Holland
- Managed the safety assurance content of the Gate 4 (ready to test) and Gate 5 (ready for handover) submissions.
- Owned the requirements allocation matrix and the hazard log through to handover, and co-authored the Safety Assurance Report for Completion.
- Assessed derailer operation and wheel lathe road bonding, and transferred residual risks to the operator, maintainer and council.
- Moved the hazard log from Excel to IBM DOORS, the first John Holland project to manage hazards in DOORS.
- Built the business case for a blockchain-based digital procurement platform, presented to the TEK leadership team in November 2019, and worked on a research proposal with RMIT.
Graduate Engineer
Sydney Metro Northwest · John Holland
- Reviewed the operational safety hazard register for traceability and did the residual risk analysis for every hazard in it.
- Supported the Design Stage 3 RAM report and operational RAM model.
- Owned intrusion management: stakeholder consultation, design options, the intruder risk framework and the Intrusion Management Safety Report.
- Wrote sections of the engineering safety case for first passenger services, and worked alarm monitoring shifts in the operations control centre in the first weeks of service.
Software
| Tool | What it does | Built with | Year |
|---|---|---|---|
| Project data platform | Brings engineering, document and schedule data into one model for reporting. | Databricks, dbt, Unity Catalog | 2025 |
| Project dashboards | Dashboards and data tools for a project team, with group-based permissions. | Flask, Databricks Apps | 2026 |
| Agent connectors | Python clients for document control and engineering systems, exposed to AI agents as MCP servers. | Python, REST, MCP | 2026 |
| System architecture model | A system breakdown and interface matrix, kept as a model in git. | SysML v2, Python | 2026 |
| Commercial forecasting app | Project cost forecasts, with purchase order data synced in. | FastAPI, Svelte, Lakebase | 2026 |
| Team tools portal | One app hosting a team's internal tools, with group-based access. | Flask, Databricks | 2025 |
| Plant billing | Fuel, e-tag and plant hire billing. | Python, Flask, Databricks | 2025 |
| Personal AI agent setup | Skills, hooks and multi-agent workflows for Claude Code that run most of my day-to-day project admin. | Claude Code, Python | 2025 |
Education and tools
- Bachelor of Engineering (Mechatronic), Honours Class 1
- UNSW Sydney, 2018
- Bachelor of Science (Physical Science)
- UNSW Sydney, 2018
- Chartered Professional Engineer (CPEng), Systems Engineering
- Engineers Australia
- International Engineering Safety Management (iESM)
- Completed
- Rail Industry Worker card
- Current
- Requirements and assurance
- IBM DOORS and DOORS Next, Relatics
- Document control
- Aconex, TeamBinder, ProjectWise, SharePoint, Bluebeam
- Data
- Databricks, Power BI, Power Platform, Microsoft Fabric
- GIS
- ArcGIS Pro, QGIS